Updates

Notes from our sites and our desks

How a school campus gets planned around the timetable

Classroom blocks, laboratories and the assembly hall cannot simply be arranged for a neat elevation. Circulation at the start and end of the day, noise separation between teaching and activity spaces, and a transport bay that keeps buses away from children all have to be settled before the structural drawings are issued.

Read More

Why hospital services are designed at foundation stage

Medical gas lines, electrical risers, plant rooms and effluent treatment are the most expensive things to retro-fit in a hospital. Designing them in at foundation stage costs nothing extra; cutting them into a finished structure costs months and a great deal of money.

Read More

What a catchment study actually looks at

Population and income profile, the schools and hospitals already serving the area, road access from every direction, and what the surrounding land is likely to become in ten years. We have walked away from sites that looked excellent on price and failed on access.

Read More

Approvals: running them in parallel, not in sequence

Building plan sanction, fire clearance and sector registration each take their own time. Pursuing them alongside the design rather than after it is frozen is usually the difference between opening on schedule and losing a year.

Read More

Hiring before the building opens

An asset that opens understaffed rarely recovers its reputation. Teachers, clinicians and facility staff are recruited and trained ahead of commissioning, which means the payroll starts before the revenue does. It is worth it.

Read More

Why we maintain what we build

Lifts, pumps, generators and water treatment are easier to keep running when the people maintaining them are the people who specified and installed them. Residents get one number to call instead of a chain of contractors who have moved on.

Read More

Reading a bill of quantities

A rate means nothing without the specification behind it. Brands, grades, measurement basis and what sits outside the rate are what decide whether a quotation holds or drifts upward through the project.

Read More

A rate means nothing without the specification behind it. Brands, grades, measurement basis and what sits outside the rate are what decide whether a quotation holds or drifts upward through the project.

Safety rules that apply to everybody

Helmets and boots without exception, registered labour, valid insurance and no work at height without a harness. The rules are the same for our own staff and for every vendor on site.

Read More

What the ecosystem idea means in practice

Helmets and boots without exception, registered labour, valid insurance and no work at height without a harness. The rules are the same for our own staff and for every vendor on site, and they are enforced by the site engineer.

Read More

Schools, Hospitals, Retail and Homes — Built and Operated

See what is under construction across our education, healthcare, retail and residential projects, and how each one is planned around the business that will run inside it.